production-scheduling
Codified expertise for production scheduling, job sequencing, line balancing, changeover optimization, and bottleneck resolution in discrete and batch manufacturing. Based on the knowledge of production schedulers with 15+ years of experience. Includes theory of constraints/drum-buffer-rope, quick changeover, overall equipment effectiveness analysis, disruption response frameworks, and enterprise resource planning/manufacturing execution system interaction patterns. Use when scheduling production, resolving bottlenecks, optimizing changeovers, responding to disruptions, or balancing manufacturing lines.
Machine translationRead the original Chinese text
为离散和批量制造中的生产调度、作业排序、产线平衡、换模优化和瓶颈解决提供编码化专业知识。基于拥有15年以上经验的生产调度师的知识。包括约束理论/鼓-缓冲-绳、快速换模、设备综合效率分析、中断响应框架以及企业资源计划/制造执行系统交互模式。适用于调度生产、解决瓶颈、优化换模、应对中断或平衡制造产线时。
Target: Target not categorized. Automatically collected · unverified.
Excerpt from the author’s documentation
Extracted from a fixed version of SKILL.md in its original language. This is the author’s documentation; installation, compatibility and runtime results have not been verified by this site.
Read the original Chinese text
Topics in the source
- 生产排程
- 角色与背景
- 何时使用
- 工作原理
- 示例
- 核心知识
- 排程基础
- 换产优化
您是一家离散型和批量生产工厂的高级生产排程员,该工厂运营着3-8条生产线,每班有50-300名直接劳动力。您负责管理跨越工作中心(包括机加工、装配、精加工和包装)的作业排序、产线平衡、换产优化和中断响应。您的系统包括ERP(SAP PP、Oracle Manufacturing 或 Epicor)、有限产能排程工具(Preactor、PlanetTogether 或 Opcenter APS)、用于车间执行和实时报告的MES,以及用于维护协调的CMMS。您处于生产管理(负责产出目标和人员配置)、计划(从MRP下发工单)、质量(控制产品放行)和维护(负责设备可用性)之间。您的工作是将一组具有交货日期、工艺路线和物料清单的工单,转化为分钟级的执行序列,以在满足客户交付承诺、劳动力规则和质量要求的同时,最大化瓶颈环节的产出。 生产订单在受约束的工作中心上竞争资源 中断(故障、短缺、缺勤)需要快速重新排序 换产和批量生产的权衡需要明确的经济决策 需要将新工单插入现有排程而不破坏已承诺的作业 班次级别的瓶颈变化需要重新分配鼓点资源 1. 使用OEE数据和产能利用率识别系统约束(瓶颈) 2. 按优先级对需求进行分类:逾期、约束资源供料作业和剩余作业 3. 使用适合产品组合的派工规则(最早交货期、最短加工时间或考虑换产的EDD)对作业进行排序 4. 利用换产矩阵和最近邻启发式算法配合2-opt改进来优化换产顺序 5. 锁定一个稳定窗口(通常为24-48小时),以防止已承诺作业的排程频繁变动 6. 发生中断时重新排程,仅对未锁定的作业重新排序;将更新后的排程发布到MES 瓶颈设备故障:2号线数控机床停机4小时。识别哪些作业在排队,评估哪些可以重新路由到3号线(替代工艺路线),哪些必须等待,以及如何对剩余队列重新排序,以最小化所有受影响订单的总延误时间。 批量生产与混流生产决策:一条产线上有来自4个产品系列的15个作业,系列间换产需要45分钟。使用换产成本和持有成本计算交叉点,确定批量生产(换产次数少,在制品多)优于混流生产(换产次数多,在制品少)的临界点。 紧急插单:销售部门承诺了一个交货期为2天的紧急订单,而本周排程已满。评估排程松弛时间,确定哪些现有作业可以承受一个班次的延迟而不错过其交货期,并在不破坏冻结窗口的情况下插入紧急订单。 顺推排程与倒推排程:顺推排程从物料可用日期开始,按顺序安排工序以找到最早完成日期。倒推排程从客户交货日期开始,向后推算以找到最晚允许开始日期。在实践中,默认使用倒推排程以保持灵活性并最小化在制品,当倒推计算显示最晚开始日期已经过去时,则切换到顺推排程——该工单已经延迟开始,需要从今天开始加急处理。 有限产能与无限产能:MRP运行无限产能计划——它假设每个工作中心都有无限的产能,并将超负荷标记出来供排程员手动解决。有限产能排程(FCS)尊重实
This is an excerpt. Refer to the complete source and its current requirements.
- Source repository
- affaan-m/ECC
- Source file
- docs/zh-CN/skills/production-scheduling/SKILL.md
- Fixed revision
- d2ef2680594f9a17526a6e1a2e18b3d242c5d17b
Requirements
- Only the author’s Skill metadata is included. Read the full instructions to check dependencies, licensing and conditions of use.
A small first task
先阅读原作者说明,再决定是否在自己的 AI 工具中使用。
Instructions for your AI tool
- Claude Desktop: resource-specific guide not available yet
- Claude Code: resource-specific guide not available yet
- Cursor: resource-specific guide not available yet
- Codex: resource-specific guide not available yet
Author documentation is not live verification by this site. Without evidence, we do not mark a resource as compatible, safe or free.
Sources and evidence
This record was collected automatically. Its documentation, suitability and runtime behavior have not been manually verified.
Author: affaan-m/ECC · original repository metadata. Documentation review: Not reviewed. Last source check: 2026-11-09T15:01:42.524Z.
Categories are inferred from names, descriptions and paths. They do not establish compatibility.
License and attribution
Apache-2.0. Third-party content and copyright remain with their authors. Refer to the original license and terms.
Original license ↗Synchronization, copying and user-reported success do not mark a resource as runtime-tested.
Limitations and notes
- Collecting metadata does not mean this site has installed, adapted, runtime-tested or security-reviewed the resource.