SKILL

sprint-plan

Plan a sprint with capacity estimation, story selection, dependency mapping, and risk identification. Use when preparing for sprint planning, estimating team capacity, selecting stories, or balancing sprint scope against velocity.

Target: Target not categorized. Automatically collected · unverified.

Excerpt from the author’s documentation

Extracted from a fixed version of SKILL.md in its original language. This is the author’s documentation; installation, compatibility and runtime results have not been verified by this site.

Read the original English text

Topics in the source

  • Sprint Planning
  • Context
  • Instructions
  • Further Reading

Plan a sprint by estimating team capacity, selecting and sequencing stories, and identifying risks. You are helping plan a sprint for $ARGUMENTS. If the user provides files (backlogs, velocity data, team rosters, or previous sprint reports), read them first. 1. Estimate team capacity: Number of team members and their availability (PTO, meetings, on-call) Historical velocity (average story points per sprint from last 3 sprints) Capacity buffer: reserve 15-20% for unexpected work, bugs, and tech debt Calculate available capacity in story points or ideal hours 2. Review and select stories: Pull from the prioritized backlog (highest priority first) Verify each story meets the Definition of Ready (clear AC, estimated, no blockers) Flag stories that need refinement before committing Stop adding stories when capacity is reached 3. Map dependencies: Identify stories that depend on other stories or external teams Sequence dependent stories appropriately Flag external dependencies and owners Identify the critical path 4. Identify risks and mitigations: Stories with high uncertainty or complexity External dependencies that could slip Knowledge concentration (only one person can do it) Suggest

This is an excerpt. Refer to the complete source and its current requirements.

Source repository
phuryn/pm-skills
Source file
pm-execution/skills/sprint-plan/SKILL.md
Fixed revision
9af7bfd0bc47fdad43c2eaa7a43cd13918e7aaef
Read the complete original documentation ↗

Requirements

  • Only the author’s Skill metadata is included. Read the full instructions to check dependencies, licensing and conditions of use.

A small first task

先阅读原作者说明,再决定是否在自己的 AI 工具中使用。

Instructions for your AI tool

Author documentation is not live verification by this site. Without evidence, we do not mark a resource as compatible, safe or free.

Sources and evidence

This record was collected automatically. Its documentation, suitability and runtime behavior have not been manually verified.

Author: phuryn/pm-skills · original repository metadata. Documentation review: Not reviewed. Last source check: 2026-11-09T16:01:01.618Z.

Categories are inferred from names, descriptions and paths. They do not establish compatibility.

License and attribution

MIT. Third-party content and copyright remain with their authors. Refer to the original license and terms.

Original license ↗

Synchronization, copying and user-reported success do not mark a resource as runtime-tested.

Limitations and notes

  • Collecting metadata does not mean this site has installed, adapted, runtime-tested or security-reviewed the resource.